Almost whole year past in reconstruction of the object, and now, finally we can say that the hotel has started working. In the past period, the main investments were reconstruction of electric lines, lightning, central heating, water installations, ventilation systems, and summer garden. Also the structural and paint works were plentifull. The inner rooms were overlayed with the carpets witch surface was more than a 1300m2. Almoust the same was the surface of ceramic works. Each room of the hotel got the all new bathrooms with shower cabins and with all necessary equipement. The restaurant and the caffe was renovated too. It is our pleasure to be the partner of the CKB bank which opened their office and ATM in the hotel.